Auto-zone-control-systems Auto-Zone CV-C Controller Installation Guide (Vers Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Équipement Auto-zone-control-systems Auto-Zone CV-C Controller Installation Guide (Vers. Auto-Zone Control Systems Auto-Zone CV-C Controller Installation Guide (Version 01A) User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 42
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0

$XWR=RQH



Vue de la page 0
1 2 3 4 5 6 ... 41 42

Résumé du contenu

Page 1 - 

$XWR=RQH

Page 3 - 3F33_^db_\\Ub

Auto-Zone CV-CSection 2Sequence of Operation 2-1InitializationInitializationInitializationInitializationOn system powerup LED1 and LED2 are extinguish

Page 4 - CVCWIR1.CDR

Section 2Auto-Zone CV-C2-2 Sequence of Operationf. Updates the diagnostic LED2 blinking.g. Stores data in the internal trend log if ready for another

Page 5 - Auto-Zone

Auto-Zone CV-CSection 2Sequence of Operation 2-3Comm LED DiagnosticComm LED DiagnosticComm LED DiagnosticComm LED DiagnosticBlinksBlinksBlinksBlinksAs

Page 6

Section 2Auto-Zone CV-C2-4 Sequence of OperationAnalog InputsAnalog InputsAnalog InputsAnalog InputsOnly Analog Input #1 (AIN1) and Analog Input #6 (A

Page 7 - CVCLED1A.CDR

Auto-Zone CV-CSection 2Sequence of Operation 2-5Analog OutputsAnalog OutputsAnalog OutputsAnalog OutputsThere are two Analog Outputs available on this

Page 8

Section 2Auto-Zone CV-C2-6 Sequence of OperationPushbutton OverridePushbutton OverridePushbutton OverridePushbutton OverrideOperationOperationOperatio

Page 9

Auto-Zone CV-CSection 2Sequence of Operation 2-7Heat Mode A heating demand is generated when the space temperature drops half theamount of the Deadban

Page 10

Section 2Auto-Zone CV-C2-8 Sequence of OperationOccupied/UnoccupiedOccupied/UnoccupiedOccupied/UnoccupiedOccupied/UnoccupiedMode of OperationMode of O

Page 11 - Auto-Zone CV-C

Auto-Zone CV-CSection 2Sequence of Operation 2-9Off Mode of OperationOff Mode of OperationOff Mode of OperationOff Mode of OperationAfter the schedule

Page 13

Section 2Auto-Zone CV-C2-10 Sequence of OperationDX Cooling OperationDX Cooling OperationDX Cooling OperationDX Cooling OperationIf the user has confi

Page 14 - Analog InputsAnalog Inputs

Auto-Zone CV-CSection 2Sequence of Operation 2-11If you have configured the system to control De-Humidification with the DX Coolingthen the compressor

Page 15

Section 2Auto-Zone CV-C2-12 Sequence of Operationc.Minimum Off Timer ( User Adjustable )Once a stage has been turned off, it must remain off for this

Page 16

Auto-Zone CV-CSection 2Sequence of Operation 2-13Chilled Water ValveChilled Water ValveChilled Water ValveChilled Water ValveOperationOperationOperati

Page 17

Section 2Auto-Zone CV-C2-14 Sequence of Operationbelow the cooling setpoint by the same amount it rose above it to start thedemand.c. Once the cooling

Page 18

Auto-Zone CV-CSection 2Sequence of Operation 2-15Step Heating OperationStep Heating OperationStep Heating OperationStep Heating OperationIf the user h

Page 19

Section 2Auto-Zone CV-C2-16 Sequence of OperationExample:Deadband = 1°FSetpoint = 72°FStage #1 Activates @ 71.5°F - Deactivates @ 72.5°FStage #2 A

Page 20 - DX Cooling Operation

Auto-Zone CV-CSection 2Sequence of Operation 2-17Once a stage has been turned off, it must remain off for this amount of timebefore it can be restarte

Page 21

Section 2Auto-Zone CV-C2-18 Sequence of OperationHot Water ValveHot Water ValveHot Water ValveHot Water ValveOperationOperationOperationOperationIf th

Page 22

Auto-Zone CV-CSection 2Sequence of Operation 2-19Once the Hot Water Valve is enabled for operation, the actual valve position is calculatedusing a Pro

Page 23

1ed_J_^U3_^db_\CicdU]cForm: AZ-CVC-DS-01A-599-0101Page 1 of 1Technical Data CV-C ControllerPower 24 Volt AC Weight 1.5 lb.Power Consumption 12 VA M

Page 24

Section 2Auto-Zone CV-C2-20 Sequence of OperationHumidity ControlHumidity ControlHumidity ControlHumidity ControlIf you selected the De-Humidification

Page 25 - Step Heating Operation

Auto-Zone CV-CSection 2Sequence of Operation 2-21Relief Pressure ControlRelief Pressure ControlRelief Pressure ControlRelief Pressure ControlIf you ha

Page 26

Section 2Auto-Zone CV-C2-22 Sequence of Operationeconomizer watches the movement of the controlling temperature to determine if itshould make any furt

Page 27

Auto-Zone CV-CSection 2Sequence of Operation 2-23Indoor Air QualityIndoor Air QualityIndoor Air QualityIndoor Air QualityIf you have configured an Ana

Page 28

Section 2Auto-Zone CV-C2-24 Sequence of OperationFan StatusFan StatusFan StatusFan StatusYou can configure one of the Analog Inputs to monitor a binar

Page 29 - Fan ControlFan Control

Auto-Zone CV-CSection 2Sequence of Operation 2-25Static Pressure SensorStatic Pressure SensorStatic Pressure SensorStatic Pressure SensorYou can insta

Page 30 - Humidity Control

Section 2Auto-Zone CV-C2-26 Sequence of OperationAlarm Detection &Alarm Detection &Alarm Detection &Alarm Detection &ReportingReportin

Page 31

Auto-Zone CV-CSection 2Sequence of Operation 2-27Cooling FailureAnytime the first stage of cooling is activated on CV-C units the SupplyAir has 30 min

Page 32

Section 2Auto-Zone CV-C2-28 Sequence of OperationPID OperationPID OperationPID OperationPID OperationThe Hot & Chilled Water Valves are controlled

Page 33

Auto-Zone CV-CSection 2Sequence of Operation 2-29The Integral ( I ) is added to itself each time through the loop. This prevents the valvefrom stoppin

Page 34

Notes:CONTROLSFILENAMEDATE:B. CREWSDESCRIPTION:PAGEDRAWN BY:CV-C Controller WiringLine VoltageSee Note 1RSHTRSHTRSHTRSHTAll Comm Loop Wiring IsStraigh

Page 35 - Static Pressure Sensor

Section 2Auto-Zone CV-C2-30 Sequence of OperationThe Integrating Interval ( TimeSP ) controls how many times per minute the calculationsare made. The

Page 37

Form: WM-CVC-SQW-01A Printed in the USA March 2002All rights reserved Copyright 2002WattMaster Controls Inc. • 8500 NW River Park Drive • Parkville M

Page 38 - PID OperationPID Operation

Notes:CONTROLSFILENAMEDATE:B. CREWSDESCRIPTION:PAGEDRAWN BY:CV-C Humidity Sensor WiringJOB NAME1.)24 VAC Must Be Connected SoThat All Ground Wires Rem

Page 39

Notes:CONTROLSFILENAMEDATE:B. CREWSDESCRIPTION:PAGEDRAWN BY:CV-C Relay Expansion Board WiringLine VoltageLine VoltageSee Note 1See Note 1Required VA F

Page 40

CONTROLSFILENAMEDATE:B. CREWSDESCRIPTION:PAGEDRAWN BY:LED DescriptionsJOB NAME06/01/00CVCLED1A.CDRAuto-Zone1EXPANSIONSENSORPRESSUREGND7AINAOUT2AOUT1AI

Page 42

Section 2Table of ContentsInitialization ...........................

Commentaires sur ces manuels

Pas de commentaire